Packaged DAF units, 2 to 150 m³/h

The workhorse of industrial pretreatment: a complete flotation plant on one frame, pre-piped and pre-wired, needing only a level slab, a power supply and pipework.

Direct answer

A packaged DAF unit is a factory-assembled, skid-mounted dissolved air flotation plant covering 2 to 150 m³/h. It carries the flotation cell, surface skimmer, saturator, recycle pump, air compressor, flocculation stage, dosing skid and control panel on a single frame. Because it needs no civil structure beyond a level reinforced slab, typical installation takes three to seven days against three to five months for a civil-built cell. Surface loading is 5–12 m/h, installed power 2–35 kW depending on size, and delivery is by flatbed or open-top container.

Capacity table

Flow m³/hFlotation area m²Skid L × W × HDry weightOperating weightInstalled power
2 – 50.4 – 0.72.2 × 1.2 × 2.0 m0.6 t2.0 t2.2 kW
5 – 100.7 – 1.52.8 × 1.4 × 2.1 m0.9 t3.2 t3.0 kW
10 – 201.5 – 2.83.5 × 1.6 × 2.2 m1.4 t5.0 t5.5 kW
20 – 402.8 – 5.54.6 × 1.9 × 2.4 m2.3 t8.5 t9.0 kW
40 – 705.5 – 9.56.0 × 2.2 × 2.6 m3.6 t14 t15 kW
70 – 1109.5 – 157.8 × 2.4 × 2.8 m5.2 t22 t22 kW
110 – 15015 – 209.5 × 2.6 × 3.0 m7.0 t31 t30 kW
Indicative envelopes for carbon-steel construction at 7.5 m/h surface loading. Actual dimensions depend on the design loading rate for your stream, materials and whether the dosing skid is integrated or free-standing. Units above roughly 60 m³/h usually ship as two or three sections for road transport.

Scope of supply

  • Rectangular flotation cell with adjustable effluent weir, sludge hopper and drain
  • Variable-speed chain-and-flight or blade skimmer, with bottom scraper where required
  • Saturator vessel, 4–6 bar, with level control, sight glass, safety relief and air injection
  • Multistage recycle pump sized on calculated recycle flow at working pressure
  • Oil-free air compressor with receiver and pressure regulation
  • Release nozzles or needle valves, accessible for cleaning without draining the cell
  • Two- or three-stage flocculation chambers with variable-speed paddles, or inline static mixing
  • Coagulant and polymer dosing pumps with calibration columns; polymer make-up unit where powder polymer is used
  • pH correction dosing where the stream requires it
  • PLC control panel with HMI, level and pressure instrumentation, dry-run and high-level protection
  • General arrangement, P&ID, foundation loading drawing, electrical schedule, O&M manual, commissioning procedure

What the site must provide

ItemRequirementCommon mistake
FoundationLevel reinforced slab, 150–250 mm, designed for operating weight plus 25 %Slab sized on dry weight
Balance tank6–12 h HRT, mixed, with level controlOmitted entirely — the single most common cause of poor performance
Screening1–3 mm fine screen upstreamCoarse screen only; fines wreck the recycle pump
Power3-phase, per installed power; stable supply or generator backupNo allowance for compressor inrush
WaterClean water for polymer make-up and wash-downPolymer made up with raw effluent
Sludge routeHolding tank, minimum 2 days, then dewatering or tankerAssuming the DAF sludge hopper is storage
Access1 m clear on three sides, 1.5 m on the skimmer drive sideUnit boxed in against a wall
DrainageBunded chemical area with separate containmentChemicals stored on open ground

Indicative price bands

Ex-works equipment only, complete with dosing skid and controls, carbon steel with epoxy lining. These are planning figures for budget purposes, not quotations.

FlowCarbon steel + epoxySS304SS316L
2 – 5 m³/hUSD 18,000 – 32,000+35 %+70 %
5 – 20 m³/hUSD 25,000 – 60,000+35 %+70 %
20 – 60 m³/hUSD 60,000 – 140,000+30 %+65 %
60 – 150 m³/hUSD 140,000 – 350,000+30 %+60 %
Excludes freight, insurance, duties, local installation, balance tank, screening and sludge dewatering. Duplex 2205 typically runs 120–180 % above carbon steel. Prices move with steel and stainless surcharges; treat these as orders of magnitude and request a quotation for anything committed.

Frequently asked questions

How long does it take to install a packaged DAF?

Three to seven days on a prepared slab for a single-piece skid: set down, connect inlet, outlet, sludge and drain, terminate power, fill and level. Multi-section units in the 60–150 m³/h range take one to two weeks to assemble. Commissioning — leak test, saturator pressurisation, jar-test confirmation, dose optimisation and operator training — adds a further three to five days.

Do I need a balance tank before a packaged DAF?

In almost every industrial application, yes. A DAF is a steady-state device: it wants constant flow, constant solids and stable pH. Industrial effluent is none of those things. Six to twelve hours of mixed balancing turns a difficult stream into an easy one, and it is by a wide margin the cheapest performance improvement available. Omitting it to save capital is the most expensive decision made in effluent plant procurement.

Can a packaged DAF be moved later?

Yes — that is one of its advantages. A skid unit can be drained, disconnected and relocated in a few days, which suits leased premises, phased factory expansion and businesses that expect to move. Civil-built cells cannot. Factor the operating weight into any crane or transport planning.

What maintenance does a packaged DAF need?

Daily: check float thickness and effluent clarity, confirm chemical levels, log saturator pressure. Weekly: clean release nozzles, check skimmer flights and chain tension, calibrate dosing pumps. Quarterly: inspect the saturator internals, service the compressor, check the recycle pump. Annually: drain and inspect the cell, check coatings and weld lines. Budget 0.5–1 operator-hour per day for a mid-sized unit.