Services
Process design, equipment supply and commissioning support for dissolved air flotation across Africa. Stated plainly, including what we do not do.
We size the plant against your effluent and your discharge consent, specify the chemical regime, supply the equipment CIF to your nominated African port, and support commissioning and operator handover. We are an independent specification and supply desk working through vetted manufacturing partners — not a manufacturer. Installation is executed by a local contractor to our drawings, which is faster and cheaper than mobilising a foreign crew. Typical timeline from enquiry to commissioned plant is four to seven months.
What we do
What we deliberately do not do
We are not a manufacturer. We are an independent specification and supply desk working through vetted manufacturing partners. That is stated plainly because you will find it out anyway, and a supplier who is vague about it at the enquiry stage is a supplier who will be vague later.
We do not sell flotation where flotation is the wrong answer. If your solids settle readily and you have the land, a clarifier costs less to buy and less to run. If your COD is largely soluble, a DAF will not meet a COD consent on its own and we will say so in the proposal rather than after commissioning.
We do not quote a price before we understand the stream. A number produced without knowing your TSS, FOG, temperature and discharge target is a number that will change.
We do not execute civil works or installation. Local contractors do this better and cheaper. We provide drawings detailed enough that they can.
How a project runs
| Stage | What happens | What we need from you | Duration |
|---|---|---|---|
| 1. Enquiry | Initial feasibility and indicative sizing | Flow, industry, any effluent data, discharge target | 1 – 2 days |
| 2. Sampling | Composite sampling protocol issued if no data exists | Site sampling over a full production cycle | 1 – 3 weeks |
| 3. Sizing | Air demand, recycle duty, flotation area at your design temperature; chemical regime proposed | Confirmation of design flow and temperature | 3 – 7 days |
| 4. Proposal | Capacity, footprint, materials, scope, lead time, CIF price to your port | Review and questions | 1 week |
| 5. Jar test | Coagulant and polymer type and dose confirmed against a real sample | A fresh composite sample, couriered | 1 – 2 weeks |
| 6. Manufacture | Fabrication, assembly, factory test | Approval of GA and P&ID | 8 – 20 weeks |
| 7. Delivery | CIF to nominated port | Customs clearance, inland transport | 3 – 7 weeks |
| 8. Installation | Local contractor to our drawings | Slab, balance tank, power, pipework | 1 – 3 weeks |
| 9. Commissioning | Start-up, dose optimisation, operator handover | Operators available for training | 3 – 5 days |
What to send with an enquiry
If you have all of this, we can size accurately. If you have only the first two, send those and we will tell you what to sample.
- Industry and process description, and the production rate
- Effluent flow: average m³/day, peak m³/h, and the hours per day the plant operates
- Effluent analysis: TSS, FOG, total COD, filtered COD, pH range, temperature
- The discharge consent — the actual document, not a recollection of it
- Whether discharge is to sewer, to environment, or to reuse
- Existing treatment, if any, and what it is failing to do
- Available space, and whether civil works are possible
- Nominated port of delivery
Request a proposal → or email office@ai-spares.com.
Frequently asked questions
Do you supply outside Africa?
Our focus is Africa, and the site, the data and the design conventions here are built around African operating conditions — ambient temperature, grid reliability, chemical availability and port logistics. We will quote elsewhere, but the value we add is specific to this continent.
Can you take over a project another supplier started?
Yes, and we do it regularly. The most common version is a unit already installed and underperforming. We start with a data review and a site assessment: measured recycle flow, actual water temperature, nozzle condition, jar test against current chemistry, and the filtered COD. In a majority of cases the problem is diagnosable and the fix costs a fraction of replacement.
What warranty applies?
Standard equipment warranty is 12 months from commissioning or 18 months from delivery, whichever falls first, covering materials and workmanship. Process performance is warranted against the influent characteristics stated in the proposal — which is why the sampling and jar-testing stages matter, and why we will not warrant performance against a stream we have never seen analysed.
Do you provide operator training?
Yes, as part of commissioning. It covers jar testing and dose adjustment, reading the float, skimmer speed setting, saturator checks, nozzle cleaning, chemical make-up and the daily log. An operator who can run a jar test and interpret it is worth more to plant performance than any instrumentation package.